Skip to content

Made to order. Made for living.

A kitchen. Uniquely yours.

Thoughtful cabinetry. Honest materials. Built to fit the way you live, in our workshop.

Scroll to explore

White oak & limestone / Design study

The details make the difference

Beautiful on the outside. Just as considered within.

The way a drawer feels. The meeting of two pieces of wood. The quiet of a closing door. A good kitchen is made of details you notice every day.

See how one is built
Photorealistic design study of an open oak drawer with visible dovetail joinery beneath a stone countertop.
Anatomy of a thoughtful kitchen / Design study
Skip past the cabinet

One base cabinet, taken apart.

Step through it, and the cabinet opens up a layer at a time. Each layer is a decision that costs more than the stock alternative. Here is what each one is.

F-04 Sage / 3D model, drawn to the shop's dimensions

1 of 7

Closed

24″ wide, 24″ deep, 34½″ high.

A standard base cabinet. Everything you are about to see is in every cabinet we build, whatever the size.

Find your finish

Your palette. Your point of view.

Soft painted tones or the warmth of natural wood. Explore ten starting points, then make the kitchen your own.

Choose a finish

F-07 / matte White oak, natural

Clear coat only. The grain stays pale and open; rift-sawn on request.

Talk to us about this finish

Colors on a screen are indicative. We make you a sample door in the finish before anything is built.

Room for inspiration

Different kitchens. The same care.

A little inspiration for what yours could become. Explore materials, light, and the feeling of a room.

Kitchen design study with rich walnut cabinetry, dark stone island, and warm natural light.

Warmth in every grain

Walnut / Soapstone
Kitchen design study with chalk white shaker cabinets, marble, and a natural oak island.

A lighter kind of living

Chalk / Natural oak
Illustrative workshop scene showing a cabinetmaker hand-sanding an oak door at a workbench.

From our hands to your home

Good things take making.

Behind every kitchen is a sequence of careful decisions. Measure. Draw. Cut. Fit. Finish. We work through the details with you, from the first conversation to the final adjustment.

Get to know the process

What it is made of.

The short version of our spec sheet, next to what a stock cabinet uses for the same part.

Materials and construction, ours next to a typical stock cabinet
PartOursTypical stock cabinet
Doors and face framesSee it on the cabinet: doors and face framesSolid hard maple, white oak, walnut, or ash, five-piece doors, cope-and-stick, floating solid panel. MDF center panel on painted doors so the paint never cracks at the joint.MDF core, thermofoil or veneer skin
CarcassSee it on the cabinet: carcass¾″ hardwood-veneer-core plywood, nine plies, edge-banded in solid wood, ⅛″ thick⅝″ particleboard, PVC banding
BackSee it on the cabinet: back½″ plywood, set in a dado and glued⅛″ hardboard, stapled
Drawer boxesSee it on the cabinet: drawer boxes⅝″ Baltic birch, half-blind, machine-cut dovetails, ¼″ plywood in a groove½″ sides, stapled, ⅛″ bottom
SlidesSee it on the cabinet: slidesSalice Futura, full-extension undermount, soft-close, 88 lb¾-extension side-mount, epoxy-coated
HingesSee it on the cabinet: hingesSalice Silentia+, concealed, soft-close, 110°, three-way adjustableFixed, no soft-close
Finishpost-catalyzed conversion varnish. Sanded to 150 then 220, sealer plus two color coats and one topcoat, cured seven days before packing.One coat, no sealer

Paint: Sherwin-Williams Emerald urethane, color-matched to any deck.

Consultation to install.

Five steps. The build is the long one, and it is long for a reason.

  1. 1

    Consultation

    1 week

    You get: A budget range and a rough scope, in writing.

    You decide: Whether we are the right shop for the job.

  2. 2

    Measure

    1 week

    You get: A measured drawing of the room, walls checked for plumb.

    You decide: Appliances, and where the sink goes.

  3. 3

    Design

    2 to 3 weeks

    You get: Shop drawings to approve, and a sample door in your finish.

    You decide: Door style, finish, hardware. Sign the drawings; this is what we build.

  4. 4

    Build

    6 to 8 weeks

    You get: Photos from the shop as the boxes come together.

    You decide: Nothing. Changes after this point cost real money, so we lock it.

  5. 5

    Install

    1 week

    You get: Cabinets set, leveled, and adjusted. A punch list, walked together.

    You decide: Counter template happens the day after; tell your fabricator.

About 12 to 14 weeks from deposit to install, as of September 2026. The ruler above is drawn to 14 weeks.

Request a consultation.

Tell us about the kitchen. We reply within two business days with a few times to meet, at the shop or at your house.

Project
Timeline